102. vol2_p028
- Date:
- 1929-05-29 and 1929-05-31
- Description:
- Image #377 (2.75" x 4.5"): "5-29-29. West side. First truss members erected in cantilever arm."; Image #378 (2.75" x 4.5"): "5-29-29. East anchor arm complete. Traveler at L9."; Image #379 (2.75" x 4.5"): "5-31-29. Traveler at L9 erecting peak strut at U10. Then moves back 15 ft. to allow boom to "duck" under strut and move forward.. Not drift."; Image #380 (2.75" x 4.5"): "5-31-29. Peak strut at U10 east side, as shown in 379.";Four 4.5" x 2.75" B/W photos numbered 377, 378, 379, 380
103. vol1_p055
- Date:
- 1929-03-13
- Description:
- Image #153 (2.75" x 4.5"): "3-13-29. One more panel to be erected."; Image #154 (2.75" x 4.5"): "3-13-29. Ready to erect the first closing bottom chord."; Image #155 (2.75" x 4.5"): "3-13-29. Erecting the closing bottom chord - south truss - Town Creek Span."; Image #158 (2.75" x 4.5"): "3-13-29. Erecting the closing bottom chord - north truss - Town Creek Span.";Three 4.5" x 2.75" B/W photos numbered 153, 154, 155, 158
104. vol1_p019
- Date:
- 1929-01-20
- Description:
- Image #52 (4.5" x 2.75"): "1-20-29. From L6, west anchor arm, looking east. Erecting viaduct traveler showing over Pier 3."; Image #53 (4.5" x 2.75"): "1-20-29. Traveler A on the Town Creek Span - rear view."; Image #57 (4.5" x 2.75"): "1-20-29. Erecting viaduct traveler on span 1D.";Three 4.5" x 2.75" B/W photos numbered 52, 53, 57
105. vol1_p049
- Date:
- 1929-03-07
- Description:
- Image #137 (4.5" x 2.75"): "3-7-29. Looking west from the east cantilever arm."; Image #138 (2.75" x 4.5"): "3-7-29. Erecting bottom laterals."; Image #139 (2.75" x 4.5"): "3-7-29. Material track laid on mud sills on Drum Island.";Three 4.5" x 2.75" B/W photos numbered 137, 138, 139
106. vol1_p052
- Date:
- 1929-03-08
- Description:
- Unnumbered Image (5" x 7"): Progress March 8, 1929 at 4:30 P.M. West (left) half of Town Creek Span completed and traveler being dismantled. Viaduct traveler erecting span 17D. East cantilever arm complete.";One 5" x 7" B/W photo
107. vol2_p048
- Date:
- 1929-06-14
- Description:
- Unnumbered Image (5" x 7"): "Progress, Cooper River Span, June 14, 1929 at 4:30 P.M.";One 5" x 7" B/W photo
108. vol1_p032
- Date:
- 1929-02-07 and 1929-02-13
- Description:
- Image #87 (2.75" x 4.5"): "2-7-29. Top chords U12 U13 showing joint at U13 and temporary jacking links. Note eye bar hangers."; Image #88 (2.75" x 4.5"): "2-13-29. Bottom chord joint L13 - Town Creek. End joint of suspended span."; Image #89 (4.5" x 2.75"): "2-13-29. Assembly of top chord U12 U13, hanger, U13 L13 and joint L13 at end of suspended span.";Three 4.5" x 2.75" B/W photos numbered 87, 88, 89
109. vol2_p039
- Date:
- 1929-06-08 and 1929-06-10
- Description:
- Image #410 (2.75" x 4.5"): "6-8-29. Progress."; Image #411 (2.75" x 4.5"): "6-8-29. Bottom chord L14 L16. Length 90 ft. Weight 17 tons."; Image #412 (2.75" x 4.5"): "6-10-29. Connecting bottom chord L12 L14 at joint L12."; Image #413 (2.75" x 4.5"): "6-10-29. Bottom chord L12 L14.";Four 4.5" x 2.75" B/W photos numbered 410, 411, 412, 413
110. vol1_p067
- Date:
- 1929-03-22 and 1929-03-28
- Description:
- Image #187 (4.5" x 2.75"): "3-22-29. Looking straight down on engine being lowered. One set of falls, 8 parts, with lead line snatched so lead off of drum is horizontal."; Image #188 (4.5" x 2.75"): " 3-28-29. Lowering the second 150 HP gas. hoisting engine from Town Creek Span. ridden down by Dougherty (Eng'm'n.), Omohundro, Leatherman, and two bridgemen. Note two sets of 5-part falls and lead lines straight up off of the drums. (See 195 & 196)"; Image #189 (4.5" x 2.75"): "3-27-29. Span Traveler A, with double deck, erected on top of deck span #12, at Pier 13.";Three 4.5" x 2.75" B/W photos numbered 187, 188, 189
111. vol1_p071
- Date:
- 1929-03-29 and 1929-03-28
- Description:
- Image #197 (4.5" x 2.75"): "3-28-29. Reaving load falls at end of boom - Traveler A - Pier 13."; Image #198 (4.5" x 2.75"): "3-28-29. Front view of Span Traveler, 40 ft. high to top deck and 18 ft. wide, on deck span. Weight about 150 tons, complete. (See also #4)."; Image #199 (4.5" x 2.75"): "3-29-29. Traveler A starting erection at Pier 13. Falsework bent erected and setting first bottom chord.";Three 4.5" x 2.75" B/W photos numbered 197, 198, 199
112. vol1_p021
- Date:
- 1929-01-20
- Description:
- Image #59 (4.5" x 2.75"): "1-20-29. Temporary tower bracing between anchor bent on Pier 4 (left) and bent 1D of Drum Island Viaduct (right). Note the different batter of the two bents, also the diagonal cable bracing, with turnbuckles (Frank Stengel)."; Image #56 (2.75" x 4.5"): "1-20-29. 100 HP Gasoline Hoist #7. Used on viaduct traveler."; Image #60 (2.75" x 4.5"): "1-20-29. Setting shoes on Pier 2.";Three 4.5" x 2.75" B/W photos numbered 56, 59, 60
113. vol1_p072
- Date:
- 1929-03-29
- Description:
- Unnumbered Image (5" x 7"): "Progress in Cooper River, March 29, 1929 at 4:30 P.M. Drum Island Viaduct (left) just completed. Span Traveler A (right) re-erected. Drum Island Viaduct / Pier 5 / 270' Deck Span / Pier 6 / 270' Deck Span / Pier 7 / 450' Anchor Arm / Pier 8 / 1050' Main Span (Cantilevers & Suspended Span) / Pier 9 / 450' Anchor Arm / Pier 10 / 270' / Pier 11 / 270' / Pier 12 / 270' / Pier 13 / East Approach Viaduct.";One 5" x 7" B/W photo
114. vol1_p081
- Date:
- 1929-04-07
- Description:
- Image #230 (2.75" x 4.5"): "4-7-29. Top deck of double-deck Span Traveler, looking toward front boom and A-frame."; Image #231 (2.75" x 4.5"): "4-7-29. Detail at heel of main (front) boom. Double-deck span traveler."; Image #234 (2.75" x 4.5"): "4-7-29. Deckspan 12 swung and steel falsework bents removed."; Image #233 (2.75" x 4.5"): "4-7-29. Detail at heel of rear boom. Double-deck traveler.";Four 4.5" x 2.75" B/W photos numbered 230, 231, 233, 234
115. vol2_p002
- Date:
- 1929-05-03
- Description:
- Image #289 (2.75" x 4.5"): "5-3-29. Erecting first bent of falsework at L2, East anchor arm."; Image #290 (2.75" x 4.5"): "5-3-29. Erecting first bottom chord of west anchor arm, Span 7, at Pier 7. Town Creek span in distance."; Image #292 (2.75" x 4.5"): "Same as 290.";Three 4.5" x 2.75" B/W photos numbered 289, 290, 292
116. vol2_p044
- Date:
- 1929-06-12
- Description:
- Image #426 (4.5" x 2.75"): "6-12-29. West cantilever arm complete to L16 U17 and hangers U17 L17 for support of suspended span erected, together with joint L17."; Image #427 (4.5" x 2.75"): "6-12-29. Joint U17 with dummy extension carrying 10" pin hole for jacking pin, etc., for controlling cantilever erection of the suspended span. (Geo. Schnell)."; Image #428 (4.5" x 2.75"): "6-12-29. Portal at entrance to the west anchor arm. Deck truss span 6 in foreground.";Three 4.5" x 2.75" B/W photos numbered 426, 427, 428
117. vol1_p040
- Date:
- 1929-02-22 and 1929-02-24
- Description:
- Image #106 (4.5" x 2.75"): "2-22-29"; Image #107 (4.5" x 2.75"): "2-22-29"; Caption under images 106 & 107: "350 Ton hydraulic jack inside links shown in #105. Looking towards suspended span (left) and towards cantilever arm (right). 10 " [diameter] Pin against which saddle casting bears passes through slotted holes in inside pair of links and its supported by the outside pair, which is riveted to the end of the cantilever arm. Note bearing shims with notch and hole in top, which carry the load while not actually jacking"; Image #117 (4.5" x 2.75"): "2-24-29. Looking straight up at U13 U14.";Three 4.5" x 2.75" B/W photos numbered 106, 107, 117
118. vol1_p017
- Date:
- 1929-01-13
- Description:
- Image #44 (4.5" x 2.75"): "1-13-29. Span Traveler A entering the west anchor arm, Town Creek Span. Blocking up to change from gauge of 19' 6", as used on viaduct, to 18' 0", the gauge of truss span stringers. Trusses 24' 0" c. to c."; Image #45 (4.5" x 2.75"): "1-13-29. Front view of #44."; Image #46 (4.5" x 2.75"): "1-13-29. Looking east across Town Creek at Piers 2 & 3. Material tower 130 ft. high is opposite Pier 4. Piers 5, 6, 7 and 8, in Cooper River, in the distance.";Three 4.5" x 2.75" B/W photos numbered 44, 45, 46
119. vol1_p033
- Date:
- 1929-02-14 and 1929-02-13
- Description:
- Image #90 (4.5" x 2.75"): "2-13-29. Erecting assembly shown in #89, completing end of cantilever arm except for dummy bottom chords L12 L13."; Image #91 (2.75" x 4.5"): "2-13-29. West side - Town Creek Span. Removing steel falsework bent #1 under anchor arm."; Image #92 (2.75" x 4.5"): "2-14-29. Joint and floorbeam at L13 ( = Lo joint of suspended span. See #93).";Three 4.5" x 2.75" B/W photos numbered 90, 91, 92
120. vol1_p016
- Date:
- 1929-01-13 and 1929-01-10
- Description:
- Image #38 (4.5" x 2.75"): "1-10-29."; Image #42 (4.5" x 2.75"): "1-13-29"; Caption under photos 38 & 42: "Timber Stair Tower, 12' x 16' in plan, and 110 ft. high. Eleven flights of stairs, each 10 ft. rise, of 12 steps each. Set up at bent 3W and braced to same at the 3rd points."; Image #43 (4.5" x 2.75"): "1-13-29"; Looking east toward Town Creek from Stair Tower. Material tower at Pier 4, on west bank of Drum Island, in the distance.";Three 4.5" x 2.75" B/W photos numbered 38, 42, 43
121. vol1_p030
- Date:
- 1929-02-07
- Description:
- Image #83 (2.75" x 4.5"): "2-7-29. Material Tower erecting Span Traveler B. Viaduct traveler erecting Span 5D - Drum Island Viaduct."; Image #84 (2.75" x 4.5"): "2-7-29. Falsework footings Nos. 4 and 5, east anchor arm - Town Creek."; Image #85 (4.5" x 2.75"): "2-7-29. Steel material Tower F067 & F0187. 40 ft. square x 130 ft. high to boom heels. Two 70 ft. boom (30 ton capacity). On dock opposite Pier 4";Three 4.5" x 2.75" B/W photos numbered 83, 84, 85
122. vol1_p015
- Date:
- 1929-01-10
- Description:
- Image #37 (2.75" x 4.5"): "1-10-29. West Approach, looking west. From top of traveler on west anchor arm of Town Creek Span."; Image #41 (2.75" x 4.5"): "1-10-29. Joint L2, Town Creek Span. Note front bearing of traveler. Tie down rods have been removed and cable used at this particular point only."; Image #40 (2.75" x 4.5"): "1-10-29. Erecting bottom chord L2L4.";Three 4.5" x 2.75" B/W photos numbered 37, 40, 41
123. vol1_p013
- Date:
- 1929-01-01 and 1929-01-03
- Description:
- Image #29 (4.5" x 2.75"): "1-1-29."; Image #30 (4.5" x 2.75"): "1-3-29." ; Image #31 (4.5" x 2.75"): "1-3-29." Caption under all pictures: "Erecting steel material tower on deck at Pier 4, Town Creek Span, with an 80 ft. boom used first as a gin pole and then as a 'basket boom.' See 32 and 33 for detail of basket support.";Three 4.5" x 2.75" B/W photos numbered 29, 30, 31
124. vol1_p014
- Date:
- 1929-01-01 and 1929-01-06
- Description:
- Image #32 (2.75" x 4.5"): "1-1-29. Base of boom in Chicago heel and 'basket', used as gin pole on dock at Pier 4."; Image #33 (2.75" x 4.5"): "1-3-29. Base of "basket boom', showing details of support."; Image #36 (4.5" x 2.75"): "1-6-29. West Approach from America St. looking east, before street was paved. (See 271.)";Three 4.5" x 2.75" B/W photos numbered 32, 33, 36
125. vol2_p099
- Date:
- 1929
- Description:
- Unnumbered Image (5" x 7"): "Same view as on preceding page, but further back, showing part of East Approach. Photos by Melcher.";One 5" x 7" B/W photo
126. vol1_p028
- Date:
- 1929-02-01
- Description:
- Unnumbered Image (5" x 7"): "Progress - Town Creek Span & Drum Island Viaduct. Feb. 1, 1929 at 4:30 P.M.";One 5" x 7" B/W photo
127. vol1_p031
- Date:
- 1929-02-08
- Description:
- Unnumbered Image (5" x 7"): "Progress. Feb. 8, 1929 at 4:30 P.M.";One 5" x 7" B/W photo
128. vol1_p060
- Date:
- 1929-03-15 and 1929-03-17
- Description:
- Image #167 (4.5" x 2.75"): "3-15-29. Unloading material from lighters to dock at Pier 4 with stiffleg derrick, for the Drum Island viaduct. (See #143.)"; Image #172 (2.75" x 4.5"): "3-17-29. Erecting first bent of false work for deck span 12. (70 ft. boom has been erected, on left, by 50 ft. boom on right and which has been taken down)."; Image #173 (2.75" x 4.5"): "3-17-29. Progress - from Cooper River. Traveler A removed. Drum Island Viaduct at bottom of grade.";Three 4.5" x 2.75" B/W photos numbered 167, 172, 173
129. vol1_p059
- Date:
- 1929-03-15
- Description:
- Image #166 (4.5" x 2.75"): "3-15-29. Hydraulic hand pump on top chord at U13, Town Creek Span. Capacity 8000 lbs. Per sq. in. 'Swede' Nelson and V.I. Varga."; Image #168 (2.75" x 4.5"): "3-15-29. Town Creek Span and Drum Island Viaduct from Cooper River. Viaduct is nearly at bottom of grade."; Image #169 (2.75" x 4.5"): "3-15-29. Material tower on dock at Pier 13. One boom erected and rigged. (50 ft. boom, on right).";Three 4.5" x 2.75" B/W photos numbered 166, 168, 169
130. vol1_p062
- Date:
- 1929-03-17 and 1929-03-20
- Description:
- Image #178 (4.5" x 2.75"): "3-17-29. Town Creek Span, from below, near Pier 3 - looking west."; Image #179 (2.75" x 4.5"): "3-17-29. Falsework bent for deck span #12, taken from the East Approach Viaduct permanent steel for temporary use."; Image #180 (2.75" x 4.5"): "3-20-29. First panel of deck span #12 erected by material tower at Pier 13. Pier 12 at left.";Three 4.5" x 2.75" B/W photos numbered 178, 179, 180
131. vol1_p020
- Date:
- 1929-01-20
- Description:
- Image #54 (2.75" x 4.5"): "1-20-29. West anchor Arm completed to L6."; Image #55 (2.75" x 4.5"): "1-20-29. Falsework footing #3 driven thru dock. Under L6, west anchor arm."; Image #58 (4.5" x 2.75"): "1-20-29. Looking up thru material tower toward viaduct traveler being erected on Span 1D, of Drum Island Viaduct. (see #57).";Three 4.5" x 2.75" B/W photos numbered 54, 55, 58
132. vol2_p066
- Date:
- 1929-06-28
- Description:
- Image #494 (2.75" x 4.5"): "6-28-29. Connected."; Image #495 (2.75" x 4.5"): "6-28-29. See 451. Jacking stick and 1 1/4" [diameter] steel 'hog-rodding' cables used to straighten L14 U15, at left. No strain from jacking on member at right."; Image #496 (4.5" x 2.75"): "6-28-29. Another view of L14 U15 with jacking device attached. Note 1 1/2" [diameter] steamboat ratchet (lower left) to take slack out of hog-rod cables before jacking.";Three 4.5" x 2.75" B/W photos numbered 494, 495, 496
133. vol1_p051
- Date:
- 1929-03-07
- Description:
- Image #143 (4.5" x 2.75"): "3-7-29. Stiffleg derrick used as material hoist on top of span at Pier 4, to feed viaduct traveler (in distance). Near stiffleg sticks thru truss (#146) and far leg is on viaduct (#145)."; Image #144 (4.5" x 2.75"): #3-7-29. Detail at heel of stiffleg derrick SO4383 (See #167)."; Image #145 (4.5" x 2.75"): "3-7-29. Tie-down and strut supporting end of stiffleg projecting outside viaduct girder (See #143).";Three 4.5" x 2.75" B/W photos numbered 143, 144, 145
134. vol1_p050
- Date:
- 1929-03-07 and 1929-03-11
- Description:
- Image #140 (2.75" x 4.5"): "3-7-29. Material truck supported on piling. Drum Island Approach."; Image #141 (2.75" x 4.5"): "3-7-29. 'Billy' the Drum Island mascot, at top of stair tower with Buckholt."; Image #142 (2.75" x 4.5"): "3-7-29. Balance beam for handling plate girders. Length 10ft."; Image #146 (2.75" x 4.5"): "3-11-29. Support & tie-down for sill of stiffleg derrick at Pier 4.";Four 4.5" x 2.75" B/W photos numbered 140, 141, 142, 146
135. vol2_p074
- Date:
- 1929-07-04 and 1929-07-02
- Description:
- Image #514 (2.75" x 4.5"): "7-2-29. The suspended span hanging free and acting as a simple truss span on the end of the cantilevers."; Image #515 (2.75" x 4.5"): "7-2-29. The Cooper River Cantilever span with the jacking chords removed from the top chord."; Image #517 (4.5" x 2.75"): "7-4-29. Scene of R.H. McKnight's death on July 3, 1929.";Three 4.5" x 2.75" B/W photos numbered 514, 515, 517
136. vol2_p073
- Date:
- 1929-06-30 and 1929-07-02
- Description:
- Image #510 (2.75" x 4.5"): "6-30-29. The completed Cooper River Span. Travelers and falsework not yet removed."; Image #511 (2.75" x 4.5"): "7-2-29. Removing the temporary jacking chords at U17."; Image #512 (2.75" x 4.5"): "7-1-29. The jacking chords at U17 removed."; Image #513 (2.75" x 4.5"): "7-2-29. The suspended span hanging free. Jacking chords at U17 removed.";Four 4.5" x 2.75" B/W photos numbered 510, 511, 512, 513
137. vol2_p017
- Date:
- 1929-05-21 and 1929-05-22
- Description:
- Image #339 (2.75" x 4.5"): "5-21-29. West anchor arm ready to erect last panel 8-10, and land on main pier 8."; Image #340 (2.75" x 4.5"): "5-22-29. East anchor arm erecting last panel 8-10, to land on main pier 9."; Image #341 (2.75" x 4.5"): "5-22-29. Setting shoe in Pier 8. wt. of lower shoe = 10 tons. Base 7'-3 x 8'-6 = 61.6 [square feet]"; Image #342 (2.75" x 4.5"): "5-22-29. Setting main shoes on Pier 8.";Four 4.5" x 2.75" B/W photos numbered 339, 340, 341, 342
138. vol2_p018
- Date:
- 1929-05-22 and 1929-05-23
- Description:
- Image #343 (2.75" x 4.5"): "5-22-29. Erecting bottom chord joint at L10, Pier 8. Weight 13 tons."; Image #344 (2.75" x 4.5"): "5-22-29. Same as 343. (Leatherman)."; Image #345 (2.75" x 4.5"): "5-22-29. Pulling joint L10 back into place to connect to bott. chord L8 L10 and diagonal M9 L10."; Image #348 (2.75" x 4.5"): "5-23-29. Bottom chord joint L10 before erection of stringers. Floorbeam in place.";Four 4.5" x 2.75" B/W photos numbered 343, 344, 345, 348
139. vol2_p020
- Date:
- 1929-05-23 and 1929-05-24
- Description:
- Image #350 (2.75" x 4.5"): "5-23-29. Pulling device (at left) at L0 - Span 9. Where deck span adjoins anchor arm."; Image #351 (2.75" x 4.5"): "5-23-29. Jacking device at end of anchor arm. Pulling device, showing turnbuckle - just beyond."; Image #352 (2.75" x 4.5"): "5-23-29. West anchor arm landed on Pier 8 (right)."; Image #353 (2.75" x 4.5"): "5-24-29. Looking west from Span 9.";Four 4.5" x 2.75" B/W photos numbered 350, 351, 352, 353
140. vol2_p021
- Date:
- 1929-05-24
- Description:
- Unnumbered Image (5" x 7"): "Progress in Cooper River, May 24, 1929 at 5: P.M. Both travelers are tied up for lack of steel. Traveler A (right) held at L8 on account of shop error in joint at L10. Traveler B (left) has moved to L9. Note U.S. Navy destroyers.";One 5" x 7" B/W photo
141. vol2_p086
- Date:
- 1929-08-02 and 1929-08-01
- Description:
- Image #557 (2.75" x 4.5"): "8-1-29. Entrance to Cooper River Span."; Image #558 (2.75" x 4.5"): "8-1-29. At the center of the Cooper River Span."; Image #559 (4.5" x 2.75"): "8-2-29. W.E. Omohundro ("Oaks") Superintendent on the Cooper River Bridge.";Three 4.5" x 2.75" B/W photos numbered 557, 558, 559
142. vol2_p078
- Date:
- 1929-07-09 and 1929-07-08
- Description:
- Image #528 (2.75" x 4.5"): "7-9-29. Another view of the jacking device used to straighten the diagonal L14 U15. See also 495 & 496."; Image #529 (2.75" x 4.5"): "7-9-29. Removing timber forms from beneath the concrete deck on the deck truss spans."; Image #530 (4.5" x 2.75"): "7-8-29. 150 FP [foot pounds] Gas. hoisting engine, weighing 31 tons, on Traveler B, hoisted up and ready to be lowered to the bridge deck.";Three 4.5" x 2.75" B/W photos numbered 528, 529, 530
143. vol2_p077
- Date:
- 1929-07-09 and 1929-07-08
- Description:
- Image #525 (4.5" x 2.75"): "7-9-29. View of truss members over one of the main bearing piers, No. 8 - depth of truss 130 ft. center to center of chords."; Image #526 (4.5" x 2.75"): "7-9-29. From Pier 11 looking toward anchor pier 10 - deck truss span 10 at left. Timber stair tower at Pier 10, 110 ft. high, unsupported for 70 ft. up to bott. chord of deck span."; Image #527 (4.5" x 2.75"): "7-8-29. Removing steel falsework columns under anchor arm.";Three 4.5" x 2.75" B/W photos numbered 525, 526, 527
144. vol2_p082
- Date:
- 1929-07-17 and 1929-07-21
- Description:
- Image #542 (4.5" x 2.75"): "7-17-29. Pouring the next to the last section of the concrete deck. Only 3 more panels to go - about 131 ft. Last section of concrete deck poured July 20, 1929, and last section of curb on July21."; Image #543 (2.75" x 4.5"): "7-21-29. C.E. Hillyers' concrete plant at the end of the West Approach. Concrete hauled 6700 ft. to center of Cooper River."; Image #544 (2.75" x 4.5"): "7-21-29. Reinforcing bar bending machine.";Three 4.5" x 2.75" B/W photos numbered 542, 543, 544
145. vol2_p085
- Date:
- 1929-07-25 and 1929-08-01
- Description:
- Image #551 (4.5" x 2.75"): "7-25-29. Sling after starting to take a strain on it. Overhauling ball prevents the end from pulling out of the half hitch. This sling will cut a cypress pile in two under 80 to 90 tons pull."; Image #554 (2.75" x 4.5"): "8-1-29. One of the most unique of bridge pictures."; Image #560 (2.75" x 4.5"): "Another view as above, further back.";Three 4.5" x 2.75" B/W photos numbered 551, 554, 560
146. vol1_p061
- Date:
- 1929-03-17 and 1929-03-20
- Description:
- Image #174 (2.75" x 4.5"): "3-17-29. Town Creek Span between Piers 9 (left) and 8 of the Cooper River Span. Looking west."; Image #175 (2.75" x 4.5"): "3-12-29. Suspended Span swung (3-16-29) and complete except last panel of floor system."; Image #176 (2.75" x 4.5"): 3-20-29. Suspended span has been swung. Note gap in top chord to right of traveler."; Image #177 (2.75" x 4.5"): 3-20-29. Temporary top chord jacking links U13 U14 removed to be replaced by permanent 'dummy' chords.";Four 4.5" x 2.75" B/W photos numbered 174, 175, 176, 177
147. vol2_p081
- Date:
- 1929-07-16 and 1929-07-15
- Description:
- Image #539 (4.5" x 2.75"): "7-15-29. Lowering 100 ft. main boom from the last span traveler. Weight about 11 tons."; Image #540 (2.75" x 4.5"): "7-16-29. Paramount sound-picture truck on a lighter, preparing to take sound-movies of the bridge."; Image #541 (2.75" x 4.5"): "7-16-29. Same as above. Note the microphone.";Three 4.5" x 2.75" B/W photos numbered 539, 540, 541
148. vol1_cover
- Date:
- 1929
- Description:
- Cooper River Bridge, Vol. 1, 1928 - 1929, Record By E.L. Durkee, Property of Beth Steel Co., Eastern District ;Album Cover, 7.25" x 12"
149. vol1_p057
- Date:
- 1929-03-15
- Description:
- Image #163 (2.75" x 4.5"): "3-15-29. Preparing to erect the closing top chords - Town Creek Span."; Image #164 (2.75" x 4.5"): "3-15-29. Gap for closing top chord U16 U18."; Image #165 (2.75" x 4.5"): "Erecting the closing top chord - south truss. Gap is about 2" longer than chord. 3-15-29."; Image #171 (2.75" x 4.5"): "3-15-29. Erecting closing top - north truss.";Four 4.5" x 2.75" B/W photos numbered 163, 164, 165, 171
150. vol1_p058
- Date:
- 1929-03-15
- Description:
- Unnumbered image (5" x 7"): Progress March 15, 1929 at 4:30 P.M. Town Creek Span - Drum Island Viaduct.";One 5" x 7" B/W photo