Image #525 (4.5" x 2.75"): "7-9-29. View of truss members over one of the main bearing piers, No. 8 - depth of truss 130 ft. center to center of chords."; Image #526 (4.5" x 2.75"): "7-9-29. From Pier 11 looking toward anchor pier 10 - deck truss span 10 at left. Timber stair tower at Pier 10, 110 ft. high, unsupported for 70 ft. up to bott. chord of deck span."; Image #527 (4.5" x 2.75"): "7-8-29. Removing steel falsework columns under anchor arm.";Three 4.5" x 2.75" B/W photos numbered 525, 526, 527
Image #516 (2.75" x 4.5"): "7-4-29. Another view of top chord at time of McKnight's death."; Image #522 (2.75" x 4.5"): "7-8-29. View from top of water tank on Meeting St. near the West Approach. Town Creek span in foreground partly hiding the Cooper River span."; Image #523 (2.75" x 4.5"): "7-9-29. Falsework struts and bracing ready to be cut up into short lengths of scrap. See 579."; Image #524 (2.75" x 4.5"): "7-9-29. Boat U1010 in drydock. Cap't. T.W. Murphy.";Four 4.5" x 2.75" B/W photos numbered 516, 522, 523, 524
Unnumbered Image (5" x 7"): "Progress in Cooper River, May 3, 1929 at 4:30 P.M. East Approach (right) complete except two spans.";One 5" x 7" B/W photo
Image #382 (2.75" x 4.5"): "5-31-29. Erecting peak strut at U10 west side, by hauling it around in the back of the boom. Traveler at L10."; Image #383 (4.5" x 2.75"): "5-31-29. Final position of 382. Erecting strut in this manner took about 2 hours as compared with 10 minutes for method shown in 379."; Image #384 (2.75" x 4.5"): "5-31-29. Looking west from U10 on east side.";Three 4.5" x 2.75" B/W photos numbered 382, 383, 384