Writing on bottom states, "156-43 US Navy Yard, SC. January 11, 1943. Group picture of Representatives of the Planning Section and the Sub-contracting Firms for the LST program. (Names follow) File 14735."
Writing on bottom states, "157-43 US Navy Yard, SC. January 11, 1943. Launching of the USS LST 359 and 360 from Building Ways 342 and 342C. Respectively. View of Sponsor's platform immedietly after releasing LST 360. File 14716."
Under tab, "Buildings 1941, 1942" Note states, "US Naval Minecraft Base Charleston, SC 0815/23 October 1953, High Tide 7.8 ft. about 0830. View of building 45, parking area and road showing the results of extreme high tides. West View."
Printing on bottom states, "205-43 US Navy Yard, SC, January 20, 1943. USS Paul Hamilton (DD 589) & USS Twiggs (DD 591) Keel Laying Ceremonies. The keel was officially laid by striking three arcs simutaneously on the keel of each vessel by the wives of Junior Officers assited by thier husbands. DD591 striking the arc and officially laying the keel. Left to right: front row: Mrs.R. G. Odiorne, Mrs. A. A. Rimmer,Mrs. J. W. Clayton, Mrs. T. H. Dwyer. File 14783."
Under tab, "Shop 931" Note states, "New Machine - Machinist W. R. McClendon demonstrates how a piece of broken tap can be removed from a valve flange through the use of the Electro Arc Metal Disintegrator recently installed in the Shipyard's Machine Shop. By the arcing process the broken tap is disintegrated, enabling the operator to lift the pieces without disassembly of the valve. May 61." Note on back states, "Navy News 24 1/2 ems May 28 issue (129546)"
Under tab, "Shop 980" Note states, "SAND SLINGER - Arthur Martin, molder, operates machine capable of providing and ramming sand at speeds to 1,000 pounds per minute. With a 19 foot operating radius fully extended, it can be raised to 5 feet 6 inches or lowered to about 2 feet 6 inches. 12 May 1961."