Image #531 (4.5" x 2.75'): "7-9-29. Lowering the first main engine from the deck of the Cooper River Span to a lighter below. Weight of engine 31 tons, plus rigging. Two sets wire cable falls of 5 parts each, leading off of the two top drums. Clutch out, frictions in, and lowered by foot brakes. Engine running to allow use of clutch if necessary."; Image #532 (2.75" x 4.5"): "7-9-29. Same as 531. Note horizontal leads of cable falls, thru snatch blocks, instead of straight up off of drums."; Image #533 (2.75" x 4.5"): "7-11-29. Removing rigging, riveting, laying forms, pouring concrete deck, & painting overhead - all at once!";Three 4.5" x 2.75" B/W photos numbered 531, 532, 533
Image #534 (2.75" x 4.5"): "7-13-29. Method of pouring concrete deck. Track elevated on timber horses which are removed after concrete is poured."; Image #535 (2.75" x 4.5"): "7-13-29. Riveting steel deck beams - just ahead of the formwork carpenters."; Image #536 (4.5" x 2.75"): "7-13-29. J.H. Reynolds. W.E. Reynolds. Winston.";Three 4.5" x 2.75" B/W photos numbered 534, 535, 536
Image #539 (4.5" x 2.75"): "7-15-29. Lowering 100 ft. main boom from the last span traveler. Weight about 11 tons."; Image #540 (2.75" x 4.5"): "7-16-29. Paramount sound-picture truck on a lighter, preparing to take sound-movies of the bridge."; Image #541 (2.75" x 4.5"): "7-16-29. Same as above. Note the microphone.";Three 4.5" x 2.75" B/W photos numbered 539, 540, 541
Image #542 (4.5" x 2.75"): "7-17-29. Pouring the next to the last section of the concrete deck. Only 3 more panels to go - about 131 ft. Last section of concrete deck poured July 20, 1929, and last section of curb on July21."; Image #543 (2.75" x 4.5"): "7-21-29. C.E. Hillyers' concrete plant at the end of the West Approach. Concrete hauled 6700 ft. to center of Cooper River."; Image #544 (2.75" x 4.5"): "7-21-29. Reinforcing bar bending machine.";Three 4.5" x 2.75" B/W photos numbered 542, 543, 544
Image #546 (4.5" x 2.75"): "7-22-29. Pulling our first pile using A-frame from one of the Span Travelers, and 150 FP [foot pounds] gas. hoist. Nine (9) part falls. Pile pulled easily at 35 tons - only 20 ft. penetration and bearing on marl. Some piles broke or cut in two under 85 to 90 ton pull."; Image #547 (2.75" x 4.5"): "7-22-29. General view of pile-pulling derrick. Timber lighter 30' x 110' x 8' +/- deep."; Image #548 (2.75" x 4.5"): "7-23-29. Method of handling piles and loading on lighters after they had been pulled.";Three 4.5" x 2.75" B/W photos numbered 546, 547, 548
Image #549 (2.75" x 4.5"): "7-23-29. 12 x 12 Timber caps and blocking removed from the falsework bents."; Image #550 (4.5" x 2.75"): "7-25-29. Sling used for pulling piles - six parts of 1 1/4" [diameter] wire cable with overhauling ball at lower end. Photo shows sling just placed around pile, before taking any strain."; Image #522 (2.75" x 4.5"): "7-25-29. Office force and timekeepers. E. Neufer, E.L.D., W.R. Drake, Roberts, Bacot, D.W. Graham, Frank.";Three 4.5" x 2.75" B/W photos numbered 549, 550, 552
Image #551 (4.5" x 2.75"): "7-25-29. Sling after starting to take a strain on it. Overhauling ball prevents the end from pulling out of the half hitch. This sling will cut a cypress pile in two under 80 to 90 tons pull."; Image #554 (2.75" x 4.5"): "8-1-29. One of the most unique of bridge pictures."; Image #560 (2.75" x 4.5"): "Another view as above, further back.";Three 4.5" x 2.75" B/W photos numbered 551, 554, 560
Image #557 (2.75" x 4.5"): "8-1-29. Entrance to Cooper River Span."; Image #558 (2.75" x 4.5"): "8-1-29. At the center of the Cooper River Span."; Image #559 (4.5" x 2.75"): "8-2-29. W.E. Omohundro ("Oaks") Superintendent on the Cooper River Bridge.";Three 4.5" x 2.75" B/W photos numbered 557, 558, 559
Image #561 (2.75" x 4.5"): "8-8-29. Four-masted Belgian Training ship lying at P.U.C. Dock. Masts 185 ft. high."; Image #562 (2.75" x 4.5"): "8-8-29. The opening day. First cars going east, coming from Charleston."; Image #562 (2.75" x 4.5"): "8-8-29. Free traffic till 4:00 P.M.! Cars now traveling in both directions."; Image #564 (2.75" x 4.5"): "8-9-29. Camera man ready to take movies of the floats parade - 2nd day of bridge opening.";Four 4.5" x 2.75" B/W photos numbered 561, 562, 562, 564
Image #565 (2.75" x 4.5"): "8-9-29. Floats parade - second day of the opening celebration."; Image #566 (2.75" x 4.5"): "8-9-29. P.U.C. float."; Image #567 (2.75" x 4.5"): "8-9-29. Floats parade."; Image #568 (2.75" x 4.5"): "8-9-29. Floats parade - looking east from the toll house.";Four 4.5" x 2.75" B/W photos numbered 565, 566, 567, 568
Image #569 (2.75" x 4.5"): "8-12-29. Toll House."; Image #570 (2.75" x 4.5"): "8-12-29. Toll House."; Image #571 (2.75" x 4.5"): "E.L.D.'s favorite view again. See also Nos. 174, 364, 444, 467, 494, and 554."; Image #572 (2.75" x 4.5"): "8-16-29. Turning a lighter over by sinking it and pulling against the tide with a rolling hitch.";Four 4.5" x 2.75" B/W photos numbered 569, 570, 571, 572
Image #573 (2.75" x 4.5"): "8-16-29. Bottom side of lighter, showing barnacles and other marine growths."; Image #574 (2.75" x 4.5"): "8-20-29. Pile-pulling derrick lighter sunk in 12 to 15 ft. of water at high tide."; Image #575 (2.75" x 4.5"): "8-20-29. Sunken derrick lighter. Photo at low tide."; Image #576 (2.75" x 4.5"): "Same as above.";Four 4.5" x 2.75" B/W photos numbered 573, 574, 575, 576
Image #577 (2.75" x 4.5"): "8-29-29. Fallen stair tower - ready to be towed in."; Image #578 (4.5" x 2.75"): "8-29-29. The last stair tower, at Pier 7, being removed by tipping it over."; Image #579 (2.75" x 4.5"): "8-29-29. Falsework steel burned into scrap lengths 20" x 5'-0". See 523.";Three 4.5" x 2.75" B/W photos numbered 577, 578, 579
Unnumbered Image (5" x 7"): "From the Mt. Pleasant shore, but further back. East Approach and the Cooper River Span on the right. Photo by Melchers.";One 5" x 7" B/W photo
Unnumbered Image (5" x 7"): "The most unique of all bridge pictures, showing North side of Cooper River Span, in the foreground, and the South side of the Town Creek Span, beneath it, in the distance.";One 5" x 7" B/W photo
Unnumbered Image (5" x 7"): "The Cooper River Bridge from the Mt. Pleasant Shore. This photo taken by the Bridge Company for advertising purposes, and published thru the Associated Press. (Taken about July 7, '29.) Photo by Jacobs.";One 5" x 7" B/W photo
Limit your search
Photographic Record of the Cooper River Bridge✖[remove]202