Accompaning note states, "Floating Drydock - To augment Drydock No. 1 and Drydock No. 2 Charleston maintains ARD 15 shown here, and ARD 12. These ARDs provide additional capability for meeting heavy docking needs to Fleet in this area."
Newspaper printed for the civilian employees of the Charleston Naval Shipyard starting on January 8th 1960. This volume covers from January 8th 1960 to December 23rd 1960.
Newspaper printed for the civilian employees of the Charleston Naval Shipyard starting on January 6th 1961. This volume covers from January 6th 1961 to December 29rd 1961.
Newspaper printed for the civilian employees of the Charleston Naval Shipyard starting on January 19th 1962. This volume covers from January 19th 1962 to December 21st 1962.
Under tab, "Shop 931" Note states, "New Machine - Machinist W. R. McClendon demonstrates how a piece of broken tap can be removed from a valve flange through the use of the Electro Arc Metal Disintegrator recently installed in the Shipyard's Machine Shop. By the arcing process the broken tap is disintegrated, enabling the operator to lift the pieces without disassembly of the valve. May 61." Note on back states, "Navy News 24 1/2 ems May 28 issue (129546)"
Under tab, "Shop 980" Note states, "SAND SLINGER - Arthur Martin, molder, operates machine capable of providing and ramming sand at speeds to 1,000 pounds per minute. With a 19 foot operating radius fully extended, it can be raised to 5 feet 6 inches or lowered to about 2 feet 6 inches. 12 May 1961."