4082. vol2_p027
- Date:
- 1929-05-29
- Description:
- Image #374 (4.5" x 2.75"): "5-29-29. Top chord joint at U10 - Span 7. Navy destroyers below. Elev. of peak approx. 280 ft. above low water. (S.R. Graham)."; Image #375 (4.5" x 2.75"): "5-29-29. Detail of main boom, hooked onto chord U8 U10."; Image #376 (4.5" x 2.75"): "5-29-29. Erecting U 8 U10. Span 9. (See 373).";Three 4.5" x 2.75" B/W photos numbered 374, 375, 376
4083. vol2_p028
- Date:
- 1929-05-29 and 1929-05-31
- Description:
- Image #377 (2.75" x 4.5"): "5-29-29. West side. First truss members erected in cantilever arm."; Image #378 (2.75" x 4.5"): "5-29-29. East anchor arm complete. Traveler at L9."; Image #379 (2.75" x 4.5"): "5-31-29. Traveler at L9 erecting peak strut at U10. Then moves back 15 ft. to allow boom to "duck" under strut and move forward.. Not drift."; Image #380 (2.75" x 4.5"): "5-31-29. Peak strut at U10 east side, as shown in 379.";Four 4.5" x 2.75" B/W photos numbered 377, 378, 379, 380
4084. vol2_p029
- Date:
- 1929-05-31
- Description:
- Image #382 (2.75" x 4.5"): "5-31-29. Erecting peak strut at U10 west side, by hauling it around in the back of the boom. Traveler at L10."; Image #383 (4.5" x 2.75"): "5-31-29. Final position of 382. Erecting strut in this manner took about 2 hours as compared with 10 minutes for method shown in 379."; Image #384 (2.75" x 4.5"): "5-31-29. Looking west from U10 on east side.";Three 4.5" x 2.75" B/W photos numbered 382, 383, 384
4085. vol2_p030
- Date:
- 1929-05-31
- Description:
- Unnumbered Image (5" x 7'): "Progress in Cooper River, May 31, 1929 at 4:30 P.M. Lost 3 days since May 24 on account of lack of steel.";One 5" x 7" B/W photo
4086. vol2_p031
- Date:
- 1929-05-31 and 1929-06-01
- Description:
- Image #381 (4.5" x 2.75"): "5-31-29. Top chord of east anchor arm, as seen from U1. Peak strut at U10 (top) is highest point of span - elev. 280 ft."; Image #385 (2.75" x 4.5"): "6-1-29. West side - erecting cantilever arm."; Image #386 (2.75" x 4.5"): "6-1-29. Erecting cantilever arm - east side.";Three 4.5" x 2.75" B/W photos numbered 381, 385, 386
4087. vol2_p032
- Date:
- 1929-06-01 and 1929-06-03
- Description:
- Image #387 (2.75" x 4.5"): "Progress 6-1-29"; Image #388 (2.75" x 4.5"): "6-3-29. E.L.D. at U10, watching erection of top chord U10 U12, east side. (See 390 & 391)."; Image #389 (4.5" x 2.75"): "6-2-29. Starting erection of east cantilever arm.";Three 4.5" x 2.75" B/W photos numbered 387, 388, 389
4088. vol2_p033
- Date:
- 1929-06-03 and 1929-06-04
- Description:
- Image #390 (2.75" x 4.5"): "6-3-29. Connecting top chord U10 U12 to joint at U10."; Image #391 (2.75" x 4.5"): "6-3-29. Erecting U10 U12 - east cantilever arm, south truss."; Image #392 (2.75" x 4.5"): "6-4-29. Progress. Looking east."; Unnumbered image (2.75" x 4.5"): "6-4-29. Progress - looking northeast.";Four 4.5" x 2.75" B/W photos numbered 390, 391, 392, unnumbered
4089. vol2_p034
- Date:
- 1929-06-06
- Description:
- Image #395 (2.75" x 4.5"): "6-6-29. Heel of main boom - upper deck of Span Traveler."; Image #398 (4.5" x 2.75"): "6-6-29. West cantilever arm, from Pier 9. U12 L12 at right."; Image #401 (2.75" x 4.5"): "6-6-29. Looking west from end of the east causeway. Town Creek Span (left) is nearly 1 3/4 miles away.";Three 4.5" x 2.75" B/W photos numbered 395, 398, 401
4090. vol2_p035
- Date:
- 1929-06-06
- Description:
- Image #399 (2.75" x 4.5") and Image #400 (2.75" x 4.5"): "Member U12 L12 East Cantilever Arm. 96'-0" c. to c. panel points. As erected this member appeared to be 3 1/2" short, due to fabrication of members, some shorter and some longer than their final geometric lengths, and due to the sub-diagonal M11 L12 (lower right). Pulled together by a 7-part auxiliary falls. Engine kept in high gear to reduce power - max. lead line pull = about 9000 [pounds], approx., giving possible capacity of 130 tons. Required one day to connect each member - two days total.;Two 4.5" x 2.75" B/W photos numbered 399, 400