1 - 4 of 4
Number of results to display per page
Search Results
2. vol1_p071
- Date:
- 1929-03-29 and 1929-03-28
- Description:
- Image #197 (4.5" x 2.75"): "3-28-29. Reaving load falls at end of boom - Traveler A - Pier 13."; Image #198 (4.5" x 2.75"): "3-28-29. Front view of Span Traveler, 40 ft. high to top deck and 18 ft. wide, on deck span. Weight about 150 tons, complete. (See also #4)."; Image #199 (4.5" x 2.75"): "3-29-29. Traveler A starting erection at Pier 13. Falsework bent erected and setting first bottom chord.";Three 4.5" x 2.75" B/W photos numbered 197, 198, 199
3. vol1_p072
- Date:
- 1929-03-29
- Description:
- Unnumbered Image (5" x 7"): "Progress in Cooper River, March 29, 1929 at 4:30 P.M. Drum Island Viaduct (left) just completed. Span Traveler A (right) re-erected. Drum Island Viaduct / Pier 5 / 270' Deck Span / Pier 6 / 270' Deck Span / Pier 7 / 450' Anchor Arm / Pier 8 / 1050' Main Span (Cantilevers & Suspended Span) / Pier 9 / 450' Anchor Arm / Pier 10 / 270' / Pier 11 / 270' / Pier 12 / 270' / Pier 13 / East Approach Viaduct.";One 5" x 7" B/W photo
4. vol1_p073
- Date:
- 1929-03-29 and 1929-04-03
- Description:
- Image #200 (4.5" x 2.75"): "Elev. 165' / 45' A-frame / 40' Traveler Trusses / 40' Deck Truss Span / 40' Flswk. Bent / Elev. 0.0 / Low Water. 3-29-29. Falsework columns are 19'-6" canters. Deck span trusses and traveler trusses are 18'-0" centers. Deck Span 12 at Pier 13."; Image #202 (4.5" x 2.75"): "4-3-29. Deck span 12 under erection. Pier 13."; Image #203 (4.5" x 2.75"): "4-3-29. First panel of deck span 5 erected by viaduct traveler, and latter is erecting Span Traveler B, the lower deck of which is complete.";Three 4.5" x 2.75" B/W photos numbered 200, 202, 203