Letters written by Senator Maybank, to the Administrator of the Federal Works Agency on behalf of the South Carolina Public Service Authority, concerning an amendment to the Indenture to permit the acquisition of additional facilities. The Authority proposed for a revision to their indenture and felt they were not being fully considered by the Public Works Authority (PWA).
Correspondence between Maybank and Jefferies concerning additional information about the construction of the Horry Transmission Line being received. Maybank hasn't received any information yet but has inquired.
Correspondence concerning a copy of a letter sent to Senator Maybank by Manning, addressing the District Engineer of the U.S. Army Engineers. Manning expresses the South Carolina Ports Authority interest in the Santee-Cooper River project.
Correspondence requesting Senator Maybank's support of the improvements to the Cooper River to Pinopolis Dam. Maybank supports the project be initiating an investigation and survey of the project.
A wholesale rate schedule for primary power and energy. The schedule includes its effective date, availability, who's applicable, character of service, connection charge, rate, billing period, minimum monthly bill, and power factor.
A reprint of a front page editorial that appeared in the News and Press of Darlington, South Carolina entitled "Santee-Cooper Controversy." The editorial concerns the battle over the acquisition of the electric properties near Columbia by the South Carolina Public Service Authority. The editorial voices support for the acquisition for the benefit of South Carolina and its residents.
A request from Senator Maybank that he be advised in advance before hearings are held before the Subcommittee on Appropriations of Rivers and Harbors. The South Carolina Public Service Authority especially wanted to be heard along with the Army Engineers.